1925

Power House

The new Power House was built in 1925. An additional boiler and engine were installed in 1935, bringing the total number of boilers to four. In 1933, a heat control system was installed in 24 of the College buildings. Two boilers were replaced and other work done in 1958-59. An addition in 1968-69 accommodated additional equipment.